Start Up:
- Saudi Arabia (Yanbu-Marafiq) : ABB (revamping 6 Gas Turbines GE & 3 Mitsubishi); Enel-Ansaldo joint venture (1 Steam Turbine)
- Oman Barka I : Enel (2 gas turbines+1 steam turbine)
- S. Korea (Doosan): 3 gas turbines
- Qatar (Ras Laffan): Client Enel/Tosi (1 steam turbine)
- Rusia (Moscova): Client ABB Rusia (thermal and power steam turbine 5MW)
- Iran (Parand, South Esfahan, Sanandaj, Mashad): Client MAPNA/Ansaldo (6X180MW, 6X180MW)
- Algeria: Batna (2x126,7MW Gas Turbines) Ansaldo Spa (Sonelgaz)Marsat El Hadjadj: ABB (MW Gas Turbine)
- New Zeeland Hydro Power Plant 2013-2014
- Chile (Bocamina) : Client Tecnimont-ENDESA-coal Power Plant
- Chile (Colbun) : Client Tecnimont (Colbun)-coal Power Plant
- Chile (Angamos) : 2X370MW RT-30 Steam Turbines Client Ansaldo (POSCO-AES)
- Egypt (6th October) : 4X150MW Gas Turbines
FAT (Factory Acceptance Test):
- Italia (Chivasso) - 1 steam turbine
- Iran (South Esfahan) - Ansaldo Gas Turbine 180MW
- Algeria Batna - 2x126.7MW
Design Engineering:
- Bahia las Minas – Boiler revamping – Panama 2007
- Le Havre – revamping Coal Power Plant EDF2012
- Cordemais – revamping Coal Power Plant EDF 2014
- New Zeeland Hydro Power Plant 2013
- Lybia (Waffa) – ESD
- Offshore Platform
Development and testing of the ABB global product Symphony S+
included ABB worldwide assistance
Training for the ABB control systems Infi and 800series:
- Saudi Arabia - Marafiq 2004 - 2 months
- Saudi Arabia - Marafiq 2013 - 1 month
- Israel – IEC 2013 and 2014 - 3 months all toghether
- Egypt – Sidi Krir 2012 - 3 weeks
- in Italy for South Korea ABB 2012 - 1 week
- in Italy for Egypt Engineers 2012 - 3 weeks
- Chile – ENDESA 2012 - 3 weeks