+40 740 184 252 , +40 341 429 745 Skype

Clients

Start Up:

  • Saudi Arabia (Yanbu-Marafiq) : ABB (revamping 6 Gas Turbines GE & 3 Mitsubishi); Enel-Ansaldo joint venture (1 Steam Turbine)
  • Oman Barka I : Enel (2 gas turbines+1 steam turbine)
  • S. Korea (Doosan): 3 gas turbines
  • Qatar (Ras Laffan): Client Enel/Tosi (1 steam turbine)
  • Rusia (Moscova): Client ABB Rusia (thermal and power steam turbine 5MW)
  • Iran (Parand, South Esfahan, Sanandaj, Mashad): Client MAPNA/Ansaldo (6X180MW, 6X180MW)
  • Algeria: Batna (2x126,7MW Gas Turbines) Ansaldo Spa (Sonelgaz)Marsat El Hadjadj: ABB (MW Gas Turbine)
  • New Zeeland Hydro Power Plant 2013-2014
  • Chile (Bocamina) : Client Tecnimont-ENDESA-coal Power Plant
  • Chile (Colbun) : Client Tecnimont (Colbun)-coal Power Plant
  • Chile (Angamos) : 2X370MW RT-30 Steam Turbines Client Ansaldo (POSCO-AES)
  • Egypt (6th October) : 4X150MW Gas Turbines

FAT (Factory Acceptance Test):

  • Italia (Chivasso) - 1 steam turbine
  • Iran (South Esfahan) - Ansaldo Gas Turbine 180MW
  • Algeria Batna - 2x126.7MW

Design Engineering:

  • Bahia las Minas – Boiler revamping – Panama 2007
  • Le Havre – revamping Coal Power Plant EDF2012
  • Cordemais – revamping Coal Power Plant EDF 2014
  • New Zeeland Hydro Power Plant 2013
  • Lybia (Waffa) – ESD
  • Offshore Platform

Development and testing of the ABB global product Symphony S+

included ABB worldwide assistance

Training for the ABB control systems Infi and 800series:

  • Saudi Arabia - Marafiq 2004 - 2 months
  • Saudi Arabia - Marafiq 2013 - 1 month
  • Israel – IEC 2013 and 2014 - 3 months all toghether
  • Egypt – Sidi Krir 2012 - 3 weeks
  • in Italy for South Korea ABB 2012 - 1 week
  • in Italy for Egypt Engineers 2012 - 3 weeks
  • Chile – ENDESA 2012 - 3 weeks

Contact us

Mobile: +40 740 184 252

Tel: +40 341 402156

Fax: +40 341 429 745

Email: office@controlengineering.ro

Application Form

If you want to join us, please send us an application form:

Join